Strategi Penjadwalan Set Up Mould Dies Mesin Press dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) dan Reliability Centered Maintenance (RCM)
DOI:
https://doi.org/10.54471/idarotuna.v4i2.65Keywords:
Reliability Centered Maintenance, Overall Equipment Effectiveness, Availability, Six Big Losses, Set Up and AdjustmentAbstract
PT. ABC is a paint manufacturing company that has been established since 1978. The products it produces are various types of paint, both water based and solvent based. Inside PT. ABC has a Metal Production Department whose job is to make paint packaging cans, because PT. ABC makes cans for packaging its paint products independently. One of the work stations that play an important role in the continuity of the production process in the Metal Production Department is the component manufacturing work station. At the work station, the process of making components is carried out using a press machine, namely by carrying out the blanking / punching process on tinplate sheets according to the size needed. Data for 12 months shows maintenance activities that are not optimal and cause high downtime because the machine is damaged, this study aims to find out how much the performance of the machine is using the Equipment Effectiveness (OEE) method as well as the loss of machines that are damaged and reduce very high down time by implementing strategies scheduling of set up intervals on ring sheet press machines with the Reliability Centered Maintenance (RCM) method. The OEE calculation results show an effectiveness value of 77.22%. There are components that are still not good and are below world class standards, namely availability of 79.81% of the standard limit of 90%. And from the results of the six big losses analysis, it is obtained that the losses that are dominant to the low availability value are set up and adjustment with a losses percentage of 10.34%. Factors that affect the high set up and adjustment time are found through fishbone diagrams. RCM analysis is performed to calculate the set up and adjustment time intervals and then make a set up and adjustment time scheduling plan. As well as given suggestions for improvements given through humans, machines, materials, methods, and the environment it is hoped that the effectiveness of the ring sheet press 1 machine can increase.
Downloads
References
Afzali, P., Keynia, F., & Rashidinejad, M. (2019). A new model for reliability-centered maintenance prioritisationofdistributionfeeders.Energy,171(january),701–709. https://doi.org/10.1016/j.energy.2019.01.040
Agara, Badik Yuda dan Hartono Gunawarman,” Analisis Efektifitas Mesin Overhead Crane dengan Metode Overall Equipment Effectiveness (OEE) di PT. BTU, Divisi Boarding Bridge,” INASEA, Vol. 15 No.1, April 2014: 62- 70.
Agus Syahabuddin. (2019). ANALISIS PERAWATAN MESIN BUBUT CY-L1640G DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI PT. POLYMINDO PERMATA. Perawatan, 2(1), 27–36.
Ansori, Nachnul dan Imron Mastajib. (2013). SISTEM PERAWATAN TERPADU. Yogyakarta: Graha Ilmu.
Anthony, Muhammad Bob. 2019. Analisis Penerapan Total Productive Maintenance (TPM) Menggunakan Overall Equipment Efectiveness (OEE) Dan Six Big Losses Pada Mesin Cold Leveller PT. KPS. JATI UNIK, 2019, Vol.2, No.2, Hal. 94-103. ISSN : 2597-6257 (Print). ISSN : 2597-7946(Online)
Ardhi, T. H., & Marfuah, U. (2019). MINIMASI DOWNTIME PADA UNIT SHORE TO SHIP DENGAN METODE RELIABILITY CENTERED MAINTENANCE ( RCM ) DI PT . MITRA SENTOSA ABADI. Perawatan, 6(2), 127–133.
Aris Fiatno , Denur Jumali, M. (2018). PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM) PADA POROS RODA DEPAN ISUZU TYPE cxz-51. Otomotif, 1(1), 9–14.
Christy, D. M., Adi, P., & Mill, H. (2019). Perancangan Jadwal Maintenance untuk Menurunkan Downtime pada Line Mesin Pellet 9 dengan Metode Reliability Centered Maintenance ( RCM ). Perawatan, 7(2), 45–52.
Dianra, A., Yanti, A. & Hendro, P., 2015. Usulan Peningkatan Overall Equipment Effectiveness (OEE) Pada Mesin Tapping Manual Dengan Meminimumkan Six Big Losses. Jurnal Online ITENAS, III(03).
Heri Wibowo, A. S. dan A. (2018). Penjadwalan perawatan komponen kritis dengan pendekatan RELIABILITY CENTERED MAINTENANCE (RCM) PADA PERUSAHAAN KARET. Perencanaan, 6(2), 79–87.
Lalu Galeh Inggil Fatristya, Fransiskus Tatas Dwiatmaji, E. B. (2018). USULAN KEBIJAKAN PERAWATAN DAN BIAYA PADA MESIN 1110 JC DENGAN MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DAN COST OF UNRELIABILITY (COUR) (STUDI KASUS: PT.XYZ). Perencanaan, 5(2), 2952–2959.
Okwuobi, S., Ishola, F., Ajayi, O., Salawu, E., Aworinde, A., Olatunji, O., & Akinlabi, S. A. (2018). A Reliability-Centered Maintenance Study for an Individual Section-Forming Machine.ProcediaTechnology,6(october),1–17. https://doi.org/10.3390/machines6040050
Piechnicki, F., Loures, E., & Santos, E. (2017). A conceptual framework of knowledge conciliation to decision making support in RCM deployment. Procedia Manufacturing, 11(June), 1135–1144. https://doi.org/10.1016/j.promfg.2017.07.235
Riyanto, A., Tatas, F., Atmaji, D., & Budiasih, E. (2018). PERANCANGAN USULAN PENGELOLAAN SPAREPART DAN KEBIJAKAN MAINTENANCE PADA MESIN ILA- 0005 MENGGUNAKAN METODE RELIABILITY CENTERED SPARES ( RCS ) DAN RELIABILITY CENTERED MAINTENANCE ( RCM ) DI PT . XYZ. Perencanaan, 5(2), 2809–2815.
Sarashvati, M. S., Industri, J. T., Teknik, F., Telkom, U., Industri, J. T., Teknik,
(2018). OPTIMASI KEBIJAKAN PERAWATAN MENGGUNAKAN METODE RELIABILITY CENTRED MAINTENANCE ( RCM ) DAN PERENCANAAN PENGELOLAAN SUKU CADANG MENGGUNAKAN RELIABILITY CENTRED SPARES ( RCS ) PADA CONTINUOUS CASTING MACHINE # 3 SLAB STEEL PLANT DI PT KRAKATAU, Tbk. Perawatan, 3(2), 7.
Supriyadi, S., Jannah, R. M., & Syarifuddin, R. (2018). PERENCANAAN PEMELIHARAAN MESIN CENTRIFUGAL DENGAN MENGGUNAKAN METODE RELIABILITY CENTERED. Perawatan, 5(2), 139–147.
Vishnu, C. R., & Regikumar, V. (2016). Reliability Based Maintenance Strategy Selection in Process Plants : A Case Study. Procedia Technology,25(Raerest),1080–1087. https://doi.org/10.1016/j.protcy.2016.08.211
Wirawati. (2020). “Analisa Pengendalian Kualitas Pada Proses Produksi Coke Di PT. Krakatau Steel Tbk”. Jurnal InTent, Vol. 3, No. 1.
Yavuz, O., Doğan, E., Carus, E., & Görgülü, A. (2019). Reliability Centered Maintenance Practices in Food Industry. Procedia Computer Science, 158(10), 227–234. https://doi.org/10.1016/j.procs.2019.09.046
Zein, I., Mulyati, D., & Saputra, I. (2019). Perencanaan Perawatan Mesin Kompresor Pada PT . Es Muda Perkasa Dengan Metode Reliability Centered Maintenance ( RCM ). Perencanaan, IV(1), 383–391.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Isrizal Anwar, Fuad Achmadi

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.