[1]
Anwar, I. and Achmadi, F. 2023. Strategi Penjadwalan Set Up Mould Dies Mesin Press dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) dan Reliability Centered Maintenance (RCM). Idarotuna : Journal of Administrative Science. 4, 2 (Oct. 2023), 115–136. DOI:https://doi.org/10.54471/idarotuna.v4i2.65.