Anwar, I., & Achmadi, F. (2023). Strategi Penjadwalan Set Up Mould Dies Mesin Press dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) dan Reliability Centered Maintenance (RCM). Idarotuna : Journal of Administrative Science, 4(2), 115–136. https://doi.org/10.54471/idarotuna.v4i2.65